Paint Project update 12/5/08
Spray ceiling texture on northeast balconies complete as well as west walkway, started to texture ceilings on southeast balconies 12/2
Started to roll Northeast balconies 12/2 first coat
Two coats of ceiling paint on floors 18 thru 14 complete.
First coat of wall paint 18 thru 15.
Pressure washed floors 13-9-5 so pressure washing complete 18 thru 5
Prj Mgr met with Roger on 12/2 to walk site discussed importance of working the scaffolding areas, the next couple of days look good as far as wind.
Currently there is some paint bubbling on the West Walkways that have been “painted”. DiIorio, PP Prj Mgr and Paint Supplier have met on 12-15-08 to review the application, the conditions and to decide on a course of action to correct the situation and resolve any future potential issues.
A surprise OSHA inspection took place and neither PPCA nor DiIorio were cited.
Wind and moisture (weather) continue to be a major issue with the project currently.
Issues:
Beams repaired by concrete contractor were not textured and not identified in DiIorio scope of work
Obtain quote to brown coat texture them with stucco thru DiIorio “to match” .
Spray texture and finish to achieve some semblance of similarity at very minimal or no cost.
Paint as repaired.
Some of you noticed the community room’s exterior wall had a large tarp over it this weekend.
There is a need to remove the old existing lathe (appears to be over an “old” green board – that must have been acceptable in the old days), and what remains of the sheathing to expose the beams.
We will then need to trim the rusted out metal studs and scab new ones to them to create a skeletal framing to attach new drywall and new proper cementitious hardie board; then stucco and paint.
East exit area to Beach lanai area ceiling has three 3X5 access panels to the previous Air Handler units for the office.
We need to remove the access panels, patch the area with steel beams, lathe and stucco to match the current façade.
5 woods doors currently need replaced, and 4 more floors need verified.
Welcome to The Pelican Brief
We recommend that you save this location to your favorite sites list. The blog will be periodically updated with news from the condominium and you can participate by sending your news, recipes, announcements, etc. to Constance Stumin, the Editor at constumin5@aol.com. Be sure to include PP or Pelican Point on the subject line of your e-mails as Ms. Stumin will not open e-mails she does not recognize. Do not send Attachments. This blog replaces the newsletter, as it will cut costs and is more environmentally friendly.
FOR YOUR INFORMATION ON THE PP
DOCUMENTS.
The Site is www.duvalclerk.com/oncoreweb
Book 14421 Page 1043 pdf file 44 pages
total
NOT THE EASIEST SITE......BUT ALL THE
DOCUMENTS AND RULES ARE THERE.
Wednesday, December 17, 2008
BUILDING UPDATE
Posted by constance stumin at 2:13 PM
Subscribe to:
Post Comments (Atom)
WE WANT TO MEET YOU!
LET YOUR NEIGHBORS GET TO KNOW YOU BETTER.
Instead of just passing in the elevator, let's get to know each other better. If you would like to be featured, tell us all about yourself. The following are just examples of things people would like to know about you. They are purely a guide. Feel free to be funny!
NAME:
EMAIL:
TELEPHONE:
TELL US SOMETHING INTERESTING/WEIRD ABOUT YOURSELF:
DO YOU HAVE A MOTTO FOR YOUR LIFE?:
DO YOU OWN OR RENT AT PELICAN POINT AND FOR HOW LONG?:
WHAT DO YOU ENJOY MOST OR LEAST ABOUT PELICAN POINT?:
SOME FAVORITE BOOKS, MOVIES, TV SHOWS:
ABOUT YOUR PETS:
YOUR IDEA OF PERFECT HAPPINESS:
YOUR HEROES /AND/ OR HEROINES:
GREATEST EXTRAVAGANCE:
FAVORITE VACATION: OR WHAT DO YOU LIKE TO DO ON VACATION?:
HOBBIES:
BEST OR WORST PHYSICAL OR MENTAL TRAIT: OR SOMETHING YOU WANT TO CHANGE ABOUT YOU?
PERSON YOU MOST ADMIRE:
WHAT WOULD YOU LIKE TO BE IN YOUR NEXT LIFE?:
MOST TREASURED POSSESSION:
ARE YOU SINGLE AND WANT TO MEET MORE PEOPLE OR A SPECIFIC TYPE OF PERSON? :
No comments:
Post a Comment